Four square

So I mentioned in the last post that we made good progress last weekend. In fact, we got the fourth wall put in place including the door and window. All together, we have 4 windows and two doors framed into the first floor. When we were framing the first window, we were in a hurry and just threw a header in place above two of the windows. At the time, we didn’t think anything of it, but as I looked at the pictures, it occurred to me that we did it incorrectly. Ugh, I couldn’t live with it being messed up, so we had to redo it. Of course, that slowed us down some but with the last walls, we were on a roll and framed everything pretty quickly.

We noticed right away that we got the header in cockeyed, but it wasn't until I went back to look at the pics that I noticed we had done the whole thing incorrectly...we needed cripple studs to support stuff better...see the next pic for the fixed window!
Proper header and cripples in place!

We used my precision adjustment tool, also known as a 10 pound sledge hammer, to aid in moving the entire wall into line with the others. We started to nail the last corner together but decided to do one last square/plumb/level check, and thank goodness we did! With a final bit of precision adjustment, we persuaded the last wall a little farther and checked everything again. Success! It turns out we have a square/plumb/level shell deluxe shed!

I am not sure if I described it adequately before, but we are building a pretty tall building. Instead of using the typical 8 foot long boards in the walls, we are using 10 foot boards. We will still have 8 foot ceilings on the first floor but the longer outer boards will provide a little extra space in the second floor sleeping loft by adding 2 extra feet before the roof cuts in. It’s like a built-in knee-wall.

We have been waffling back and forth as to whether we want to extend the sleeping loft to include the entire second floor or if we wanted a taller ceiling in the common area. We decided to make a solid second floor. Aside from giving us extra space, the solid floor will make it easier for Emily and me to frame the loft/rafters.

So, this coming weekend, we plan to get the remaining OSB hung. As soon as we do that, I plan to build a few inside walls to separate the kitchen and bathroom and then we will frame up the loft. Since we have a square/plumb/level house, the loft should be much more straight forward. So Huey Lewis and I are hip to be square!

See all of the progress on the cabin


4 thoughts on “Four square

  1. Wow! Coming right along!
    Question: With all that space under the cabin, how will y’all ever get warm if you use it during the winter? The floor would be freezing.

  2. Good question. I’ve been wondering that. Also wondering how you keep pipes from freezing….drains, water, etc. It really is coming along great. Can’t wait to see it under roof.

  3. Butch also has the “square/plumb/level check,” gene.
    I agree with Capri Lis, y’all are AMAZING!
    Butch and I are going to expire still trying to finish putting our front yard back together and you Guys are building a HOUSE!
    Looking good!

Comments are closed.